![]() |
|
|
#507 |
|
Sep 2004
2·5·283 Posts |
It's going to be very close counting with the increase of n size.
G4000 is doing 4200 pairs/day, IB400 8814 pair/day and C443 1800 pairs/day. I'm doing 1000 pairs/day, Mini-Geek 236 pairs/day, what about you Ian? I'll leave a message on XS forum to see if Glenn can add a few more cores for a week. Last fiddled with by em99010pepe on 2008-12-01 at 22:06 |
|
|
|
|
#508 | |
|
A Sunny Moo
Aug 2007
USA (GMT-5)
3·2,083 Posts |
Quote:
Last fiddled with by mdettweiler on 2008-12-01 at 23:12 |
|
|
|
|
|
#509 | |
|
A Sunny Moo
Aug 2007
USA (GMT-5)
3×2,083 Posts |
Quote:
If I divide 275000 by 16050, I get approximately 17 days to complete Drive #1. Of course, that is not factoring in any increases in the amount of time it takes to run each k/n pair, nor is it factoring in the amount of manual work that Ian does each day. I'll see if I can come up with some more accurate calculations later, factoring in FFT jumps and Ian's manual work.
|
|
|
|
|
|
#510 | |
|
A Sunny Moo
Aug 2007
USA (GMT-5)
3×2,083 Posts |
Quote:
All the remaining work will be at the 40960 FFT length.On my 2.2Ghz Core 2 Duo, I get about 0.82 ms per iteration at n=600K, again for k=701. For n=570K, I get almost the exact same time per iteration - 0.82 ms! Based on this, and presuming that my assumption of 11000 k/n pairs per n=1K is correct, then we're on course to finish Drive #1 by December 17! ![]() If you guys see any glaring errors in these calculations, feel free to point them out.
Last fiddled with by mdettweiler on 2008-12-02 at 01:20 |
|
|
|
|
|
#511 |
|
Account Deleted
"Tim Sorbera"
Aug 2006
San Antonio, TX USA
17·251 Posts |
I don't see any glaring errors, but something you're not taking in to account is that not everything will finish at the same moment. I'm currently on course to finish on December 18th, so I shouldn't hold us up too much, but still...It should probably only be 1-5 days longer and still well within the end of the year, but it is something to consider.
|
|
|
|
|
#512 |
|
May 2008
Wilmington, DE
22·23·31 Posts |
I should easily finish my ranges by the 17th. Don't want to hold anything up. We certainly picked up some speed somewhere.
I also think I can sieve 1005-2000K to 1T by then. Should make for an interesting last 2 weeks this year in NPLB land. Manually I'm doing about 800/day. Last fiddled with by MyDogBuster on 2008-12-02 at 02:47 |
|
|
|
|
#513 |
|
"Lennart"
Jun 2007
46016 Posts |
|
|
|
|
|
#514 | |
|
May 2007
Kansas; USA
2×41×127 Posts |
Quote:
HOLY SMOLY!! surprised:surprisedSomething in my gut tells me this is incorrect. It's taking a good couple of weeks for us to process the only n=~11K range that is currently loaded in port 400. I still can't see how we'll do the entire n=578K-600K range that is left in just 2.5 weeks. Perhaps BlisteringSheep adding the equivalent of ~2 quads has helped more than I expected. I'm going to have to do a very detailed check on this since I'll quickly be able to get the exact k/n pairs remaining for unreserved ranges. But if it is correct, heck we don't need rallies or anything else. That said, we'll still have at least 1 rally because they're fun! Regardless, to finish 2 weeks early would be very exciting!Edit: BTW, if some people's reservations are still being worked on a few days after the servers are dry, that's no big deal as long as they're done before year end! :-) Gary Last fiddled with by gd_barnes on 2008-12-02 at 07:38 |
|
|
|
|
|
#515 |
|
I ♥ BOINC!
Oct 2002
Glendale, AZ. (USA)
3×7×53 Posts |
In the past 5 days, we have completed (now located at the top of the stats page) http://nplb.ironbits.net/progress_400.html
Total knpairs for all days shown: 41408 Last fiddled with by IronBits on 2008-12-02 at 07:38 |
|
|
|
|
#516 | |
|
May 2007
Kansas; USA
28AE16 Posts |
Quote:
First some assumptions: Port 400: 1. Apparently BlisteringSheep dropped his machines off of port 400 sometime yesterday so I'm assuming that he won't have any on for the rest of the time. 2. I added an 8th quad to port 400 about the same time yesterday. The approximate average on port 400 the last few days without Blis is 7150. Adding my additional quad adds another 750. This results in an average of 7900 / day for port 400; moderately lower than Carlos's 8800 / day figure. Manual ranges: I will assume that everyone is approximately 1/3rd done with their currently reserved manual ranges. I will exclude Lennart's range altogether because I'll assume that he'll be done well before Dec. 17th with it. Misc.: The port 4000 figure looked close and I'll use everyone else's estimates for port 443 and their manual ranges. Although we're losing about 900 pairs / day on port 400 with this estimate, my estimate WILL include the 800 pairs / day done manually by Ian. So the 2 will almost offset one another. Now to the remaining pairs. There are a lot more remaining than originally calculated. Calculations as of ~8 AM GMT on Dec. 2nd: Code:
n=578.5K-600K 250,170 port 400 39,569 port 4000 16,237 port 443 8,384 n=547.3K-547.7K 4,798 * 2/3 = 3,200 (assumes 1/3rd done) n=575.2K-576K 9,278 * 2/3 = 6,185 n=576K-577K 11,613 * 2/3 = 7,742 Total remaining: 331,487 Process per day: port 400 7,900 port 4000 4,200 port 443 1,800 Carlos 1,000 Ian 800 Mini 236 Total processing per day: 15,936 Now, even though there are no fftlen increases, the # of iterations per test still goes up. Example, let's say n=100K takes 100 secs. to test. For the same fftlen at n=120K, it would take 120 secs. to test. The approximate average current test is n=572K. If you split the difference on what is left, you have (600K+572K)/2=586K. So the added time that it will take for the average remaining test will be 586K / 572K or 2.45% longer. Adding 2.45% to 20.8 gives 21.3 days. Argh! That was a worthless adjustment. lol So we're looking at finishing 21 days after Dec. 2nd or Dec. 23rd. Alas, Santa Claus arrives a bit early! ![]() Hopefully Blis will be back, which will help. Regardless, let's see if we can get a rally in there and finish by the 20th or 21st! It looks like I was way off base in thinking that there must be a serious error in the original calculations. I really thought it would be shortly after the end of the year when we would finish. Before Ian came on board, I was figuring on mid-late Jan. Thanks to everyone for calculating your processing rates and for contributing all of your mean machines to our effort! Gary Last fiddled with by gd_barnes on 2008-12-02 at 09:30 |
|
|
|
|
|
#517 | |
|
May 2008
Wilmington, DE
B2416 Posts |
Quote:
|
|
|
|
![]() |
| Thread Tools | |
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Team drive #14: k=600-1001 n=1M-2M | mdettweiler | No Prime Left Behind | 10 | 2021-03-13 22:32 |
| Team drive #7 k=800-1001 n=600K-1M | gd_barnes | No Prime Left Behind | 127 | 2011-07-15 14:25 |
| Team drive #6 k=600-800 n=600K-1M | gd_barnes | No Prime Left Behind | 89 | 2011-03-10 12:34 |
| Team drive #5: k=400-600 n=600K-1M | gd_barnes | No Prime Left Behind | 135 | 2010-11-23 14:27 |
| Team drive #4, 15 k's < 300 for n=600K-1M | gd_barnes | No Prime Left Behind | 38 | 2008-10-22 16:20 |