![]() |
|
|
#1 |
|
Jul 2007
Poland
100110112 Posts |
12310 numbers claimed. First two blocks of about 1200 numbers have just started. Next ones will start very soon (three CPU's need a few hours to finish the previous tasks).
Last fiddled with by WsF on 2007-10-09 at 17:10 |
|
|
|
|
|
#2 |
|
Jul 2007
Poland
5×31 Posts |
2376 (19.30%) numbers tested; 31 factors found.
|
|
|
|
|
|
#3 |
|
Jul 2007
Poland
2338 Posts |
4537 (36.86%) trial factored; 65 factors (1.43% of done) found. The first half (58.5-58.75) should be ready on Thu., Oct. 25.
|
|
|
|
|
|
#4 |
|
Jul 2007
Poland
9B16 Posts |
6423 (52.18%) done. 103 factors found (1.604% of done). About 100 numbers in the first half left. The last subrange (58.95-59.00) with 1168 numbers will start in a day or two.
|
|
|
|
|
|
#5 |
|
Jul 2007
Poland
5·31 Posts |
The first subrange (58.5-58.75) is ready (98 factors out of 6182 numbers) and the results will be sent to GW soon. All range is 64.13% done (7895 numbers with 120 factors). Statistic and factors available at my page. The last subrange (58.95-59.00) should be ready on Nov. 8, but after moving it to the other comp it can be done day or two earlier.
|
|
|
|
|
|
#6 |
|
Jul 2007
Poland
9B16 Posts |
Status: 9289 numbers TF'ed (75.46%); 135 factors (1.45% of done) found.
Five comps working on this range should stop between Nov. 3-Nov.7. On Nov. 3 numbers from the slowest one will be moved onto the first which will stop. Hence, all range should be ready on Nov.5 or 6. On Nov. 3 I'll start a new range. |
|
|
|
|
|
#8 |
|
Jul 2007
Poland
5×31 Posts |
11797 (95.83%) done. 186 factors (1.58%). Finish in two days or so (513 numbers to do). One comp is free so a new range will start in a few hours.
The status file has been updated. |
|
|
|
|
|
#9 |
|
Jul 2007
Poland
100110112 Posts |
58.5-59.0M to 63 bits finished. 192 factors found. Results sent to GW and attached. 62-63M to 63 bits has been started.
|
|
|
|