mersenneforum.org  

Go Back   mersenneforum.org > Great Internet Mersenne Prime Search > Data

Reply
 
Thread Tools
Old 2023-01-11, 19:41   #254
Prime95
P90 years forever!
 
Prime95's Avatar
 
Aug 2002
Yeehaw, FL

17·487 Posts
Default

Quote:
Originally Posted by chris2be8 View Post
Would P+1 be useful to help get 4.96M or 6.48M below 200 unfactored exponents?
No. ECM has polynomial stage 2 in 30.9/30.10, P+1 not yet.
Prime95 is offline   Reply With Quote
Old 2023-01-14, 18:55   #255
alpertron
 
alpertron's Avatar
 
Aug 2002
Buenos Aires, Argentina

152310 Posts
Default

I've just completed the factorization effort on 17.1M. Now this range has 4000 Mersenne numbers factored.

I found 101 factors, 83 of them with B1 = 1M, B2 = 500M and 18 of them with B1 = 4M, B2 = 2G.
alpertron is offline   Reply With Quote
Old 2023-01-15, 03:33   #256
congsz
 
congsz's Avatar
 
"Cong Shengzhuo"
Sep 2021
Nanjing, China

4710 Posts
Default

I am reserving 3.12M with B1=30000000, B2=~76836846450, since I have already done quite a bit of P-1 Stage 1 and has started working in Stage 2.

Progress in my other ranges:
4.96M ECM to T25 is slowly progressing, now at M4961543, estimated completion: 2024
8.90M & 8.91M & 8.93M completed, 8.95M just started, 8.94M halfway done.
8.92M will be done with high bounds (B1=50000000, B2=~1281*B1) in order to reach <200 unfactored. Now the stage 1 of 10/~217 exponents are done, currently doing stage 1 without reporting results.
8.98M planning to start.

Last fiddled with by congsz on 2023-01-15 at 04:06 Reason: Update in progress
congsz is offline   Reply With Quote
Old 2023-01-15, 05:23   #257
petrw1
1976 Toyota Corona years forever!
 
petrw1's Avatar
 
"Wayne"
Nov 2006
Saskatchewan, Canada

3·52·71 Posts
Default

Quote:
Originally Posted by congsz View Post
I am reserving 3.12M with B1=30000000, B2=~76836846450, since I have already done quite a bit of P-1 Stage 1 and has started working in Stage 2.

Progress in my other ranges:
4.96M ECM to T25 is slowly progressing, now at M4961543, estimated completion: 2024
8.90M & 8.91M & 8.93M completed, 8.95M just started, 8.94M halfway done.
8.92M will be done with high bounds (B1=50000000, B2=~1281*B1) in order to reach <200 unfactored. Now the stage 1 of 10/~217 exponents are done, currently doing stage 1 without reporting results.
8.98M planning to start.
I didn't notice any activity in 3.1M so I reserved the whole range about a month ago on post #1
I've completed S1 and S2 on 20 exponents in the 3.12M sub-range already and about 50 more up to 3.123M with Stage1 with B1= about 9M; including the 10 you have already S1'd to 30M. This will make my effort wasted.

I don't report results until both S1 and S2 are complete; scheduled for about a 6 weeks from now.

Did you by any chance mean to reserve 3.11M? since 3.12 is already under 200 Unfactored and 3.11 needs 12 more.

Let me know what you want to do.
Can you hold off 3.12M for a while until I am done?
Otherwise I need to discard my assignments and find other.

Last fiddled with by petrw1 on 2023-01-15 at 05:23
petrw1 is offline   Reply With Quote
Old 2023-01-15, 05:39   #258
congsz
 
congsz's Avatar
 
"Cong Shengzhuo"
Sep 2021
Nanjing, China

47 Posts
Default

I have already done a complete 3.12M P-1 stage 1 from M3120079 to M3121259 (including M3120079 and M3121259), starting at the end of November and finished in Dec 26.
When I started doing P-1, there were no assignments in this range in post #1.
Other exponents are totally untested.

I don't want my effort to go to waste either, so I would like to finish Stage 2 on the exponents I have tested.
Others are freely left for you.

I do not mean to reserve 3.11M.

Last fiddled with by congsz on 2023-01-15 at 05:39
congsz is offline   Reply With Quote
Old 2023-01-15, 05:54   #259
petrw1
1976 Toyota Corona years forever!
 
petrw1's Avatar
 
"Wayne"
Nov 2006
Saskatchewan, Canada

3×52×71 Posts
Default

Quote:
Originally Posted by congsz View Post
I have already done a complete 3.12M P-1 stage 1 from M3120079 to M3121259 (including M3120079 and M3121259), starting at the end of November and finished in Dec 26.
When I started doing P-1, there were no assignments in this range in post #1.
Other exponents are totally untested.

I don't want my effort to go to waste either, so I would like to finish Stage 2 on the exponents I have tested.
Others are freely left for you.

I do not mean to reserve 3.11M.
OK thanks.

You didn't post that you were doing this, otherwise I would not have taken them.
petrw1 is offline   Reply With Quote
Old 2023-01-15, 06:31   #260
congsz
 
congsz's Avatar
 
"Cong Shengzhuo"
Sep 2021
Nanjing, China

47 Posts
Default

Quote:
Originally Posted by petrw1 View Post
OK thanks.

You didn't post that you were doing this, otherwise I would not have taken them.
OK. I will post a message here whenever I start working in a new range in the future.

Last fiddled with by congsz on 2023-01-15 at 06:32
congsz is offline   Reply With Quote
Old 2023-01-16, 05:13   #261
petrw1
1976 Toyota Corona years forever!
 
petrw1's Avatar
 
"Wayne"
Nov 2006
Saskatchewan, Canada

3·52·71 Posts
Default Vacation

I'll be away for a couple months with sporadic Internet access.
Updates and communication from me is uncertain during that time.

Please continue to let each others know in this thread what ranges you are working on.
Here's hoping for continued awesome participation while I'm gone.

Thanks and Tally Ho!!!!
petrw1 is offline   Reply With Quote
Old 2023-01-16, 05:19   #262
chalsall
If I May
 
chalsall's Avatar
 
"Chris Halsall"
Sep 2002
Barbados

2·112·47 Posts
Default

Quote:
Originally Posted by petrw1 View Post
Thanks and Tally Ho!!!!
Travel safe. And, a laptop isn't that heavy...
chalsall is offline   Reply With Quote
Old 2023-01-20, 03:20   #263
masser
 
masser's Avatar
 
Jul 2003
Behind BB

2×7×11×13 Posts
Default Very Low Cleanup

There are about 25 exponents below 100K (i.e. p<1e5) with B1 less than the value prescribed for this project. I'm going to complete those exponents in the next few days.
masser is offline   Reply With Quote
Old 2023-01-20, 22:31   #264
DrobinsonPE
 
Aug 2020

2568 Posts
Default

Another range finished. This one was already partially completed by someone else so it went quick.

7.0 DrobinsonPE --- COMPLETE (63)
DrobinsonPE is offline   Reply With Quote
Reply



Similar Threads
Thread Thread Starter Forum Replies Last Post
How to optimize the sieving stage of QS? Ilya Gazman Factoring 6 2020-08-26 22:03
Placeholder: When is it legal to torrent BBC tv stuff? kladner Lounge 3 2018-10-01 20:32
Future project direction and server needs synopsis gd_barnes No Prime Left Behind 6 2008-02-29 01:09
Unreserving exponents(these exponents haven't been done) jasong Marin's Mersenne-aries 7 2006-12-22 21:59
A distributed-computing project to optimize GIMPS FFT? Genetic algorithms GP2 Software 10 2003-12-09 20:41

All times are UTC. The time now is 14:13.


Fri Jul 7 14:13:44 UTC 2023 up 323 days, 11:42, 0 users, load averages: 2.28, 1.62, 1.36

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2023, Jelsoft Enterprises Ltd.

This forum has received and complied with 0 (zero) government requests for information.

Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation.
A copy of the license is included in the FAQ.

≠ ± ∓ ÷ × · − √ ‰ ⊗ ⊕ ⊖ ⊘ ⊙ ≤ ≥ ≦ ≧ ≨ ≩ ≺ ≻ ≼ ≽ ⊏ ⊐ ⊑ ⊒ ² ³ °
∠ ∟ ° ≅ ~ ‖ ⟂ ⫛
≡ ≜ ≈ ∝ ∞ ≪ ≫ ⌊⌋ ⌈⌉ ∘ ∏ ∐ ∑ ∧ ∨ ∩ ∪ ⨀ ⊕ ⊗ 𝖕 𝖖 𝖗 ⊲ ⊳
∅ ∖ ∁ ↦ ↣ ∩ ∪ ⊆ ⊂ ⊄ ⊊ ⊇ ⊃ ⊅ ⊋ ⊖ ∈ ∉ ∋ ∌ ℕ ℤ ℚ ℝ ℂ ℵ ℶ ℷ ℸ 𝓟
¬ ∨ ∧ ⊕ → ← ⇒ ⇐ ⇔ ∀ ∃ ∄ ∴ ∵ ⊤ ⊥ ⊢ ⊨ ⫤ ⊣ … ⋯ ⋮ ⋰ ⋱
∫ ∬ ∭ ∮ ∯ ∰ ∇ ∆ δ ∂ ℱ ℒ ℓ
𝛢𝛼 𝛣𝛽 𝛤𝛾 𝛥𝛿 𝛦𝜀𝜖 𝛧𝜁 𝛨𝜂 𝛩𝜃𝜗 𝛪𝜄 𝛫𝜅 𝛬𝜆 𝛭𝜇 𝛮𝜈 𝛯𝜉 𝛰𝜊 𝛱𝜋 𝛲𝜌 𝛴𝜎𝜍 𝛵𝜏 𝛶𝜐 𝛷𝜙𝜑 𝛸𝜒 𝛹𝜓 𝛺𝜔