![]() |
|
|
#364 | ||
|
Account Deleted
"Tim Sorbera"
Aug 2006
San Antonio, TX USA
17×251 Posts |
Quote:
Quote:
|
||
|
|
|
|
|
#365 | |
|
A Sunny Moo
Aug 2007
USA (GMT-5)
3·2,083 Posts |
Quote:
![]() Regardless, I'll be keeping my cores on port 1400 for the foreseeable future. I don't have too much time these days to micromanage personal efforts, so I'm glad to run whatever we're doing lately as a team effort.
Last fiddled with by mdettweiler on 2014-06-09 at 03:44 |
|
|
|
|
|
|
#366 |
|
May 2007
Kansas; USA
1040310 Posts |
Very good. When we get past n=~995K on S6, I'll load up R6 for n=1.5M-1.6M into port 1400 to start with and will continue loading more later on until we're done with the base 2/4 sieving effort.
|
|
|
|
|
|
#367 | |
|
Jun 2009
22·32·19 Posts |
Quote:
I thought about doing some more R6 work. What keeps me from doing so ATM is that I want to finish one or two of my longtime reservations first. But there are at least 4 cores I will switch to R6 when it's online. |
|
|
|
|
|
|
#368 | |
|
May 2007
Kansas; USA
242438 Posts |
Quote:
In the mean time, shortly we're going to need to start a sieving effort for both sides of the team efforts for base 16 n=500K-1M. R16 is already complete to n=500K and S16 will be there within a couple of days. ...busy times ahead for the project
|
|
|
|
|
|
|
#369 |
|
Jun 2009
12548 Posts |
I was thinking weeks or months rather than days before getting a manual reservation LOL. But those 4 cores will be free in about a week, so that fits quite nicely.
|
|
|
|
|
|
#370 |
|
"Lennart"
Jun 2007
21408 Posts |
I will add about 20 core to clean up base 6.
Lennart Last fiddled with by Lennart on 2014-06-10 at 11:34 |
|
|
|
|
|
#371 |
|
May 2007
Kansas; USA
101·103 Posts |
Excellent! I'll go ahead and add all of Riesel base 6 for n=1.5M-2M shortly.
Last fiddled with by gd_barnes on 2014-06-11 at 20:04 Reason: remove LLR-PFGW comments |
|
|
|
|
|
#372 |
|
May 2007
Kansas; USA
28A316 Posts |
Wow. Port 1400 is already handing out R6 work. Although we still have a little over 100 tests left to finish up on S6, that was very fast to get to this point!
Last fiddled with by gd_barnes on 2014-06-11 at 20:05 Reason: remove LLR-PFGW comments |
|
|
|
|
|
#374 |
|
May 2007
Kansas; USA
101000101000112 Posts |
All pairs have been processed and the drive is now officially complete to n=1M! Thank you everyone for your contributions.
![]() In a manner similar to both sides of base 16, we will keep the drive intact and eventually begin sieving a higher n-range. |
|
|
|
![]() |
| Thread Tools | |
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Sierp base 16 - team drive #1 | gd_barnes | Conjectures 'R Us | 254 | 2014-06-10 16:00 |
| Sierp base 63 - team drive #5 | rogue | Conjectures 'R Us | 146 | 2011-04-20 05:12 |
| Sierp base 3 - mini-drive II | gd_barnes | Conjectures 'R Us | 46 | 2009-10-26 18:19 |
| Sierp base 3 - mini-drive Ib | gd_barnes | Conjectures 'R Us | 43 | 2009-03-06 08:41 |
| Sierp base 3 - mini-drive Ia | gd_barnes | Conjectures 'R Us | 170 | 2008-11-11 05:10 |