#496 | |
|
If I May
"Chris Halsall"
Sep 2002
Barbados
100110001001112 Posts |
Quote:
I've also changed the default Pledge level to 70, but people can of course lower this to 69 if they want. If the Pledge is 70 and "What Makes Sense" is the option, then only candidates above 29.69M will be assigned. |
|
|
|
|
|
|
#497 | |
|
Apr 2011
in vivo
10010112 Posts |
Quote:
When I've had hard locks, it was usually about 30 minutes after the last time I had looked at the machine. |
|
|
|
|
|
|
#498 | |
|
If I May
"Chris Halsall"
Sep 2002
Barbados
9,767 Posts |
Quote:
Last fiddled with by chalsall on 2012-02-08 at 18:00 Reason: Damn mouse double-pasted again. Grrrr... |
|
|
|
|
|
|
#499 |
|
Apr 2010
Over the rainbow
2·1,303 Posts |
I was sad because this peculiar P-1 find could have been found with TF in about the same time (and a tad more GHz)
Last fiddled with by firejuggler on 2012-02-08 at 18:18 Reason: make the phrase clearer |
|
|
|
|
|
#500 | |
|
If I May
"Chris Halsall"
Sep 2002
Barbados
100110001001112 Posts |
Quote:
However, it is important to remember that this "game" is all about the aggregate statistics and probabilities. Where do the "curves" cross? While in this particular case your above is true, over the full set it isn't. |
|
|
|
|
|
|
#501 |
|
If I May
"Chris Halsall"
Sep 2002
Barbados
9,767 Posts |
Just a note...
So everyone knows, we are currently well ahead of the DC "wave-front". However, we're still working deep within the LL "wave", although pulling ahead. Thus, I have made a note on the DCTF assignment page suggesting that workers consider doing LLTF work instead. As always, I'm a strong believer in the GIMPS philosophy that people should do the work they enjoy doing. However, please know that at this point in time the best thing for GIMPS is LLTF work, not DCTF work. |
|
|
|
|
|
#502 |
|
Apr 2010
Over the rainbow
2·1,303 Posts |
should I unreserve my DCTF (upon completion of my current) work and do LLTF? (2 29M and 25 30M)
Last fiddled with by firejuggler on 2012-02-08 at 19:31 |
|
|
|
|
|
#503 |
|
If I May
"Chris Halsall"
Sep 2002
Barbados
9,767 Posts |
|
|
|
|
|
|
#504 |
|
"Kieren"
Jul 2011
In My Own Galaxy!
27AE16 Posts |
I have had one mfaktc instance doing LL-TF, and one doing DC-TF. In light of the current status of those areas I'll start adding LL-TFs to the second worker. I'll still let the DCs finish, though.
|
|
|
|
|
|
#505 |
|
If I May
"Chris Halsall"
Sep 2002
Barbados
9,767 Posts |
Hey all.
After only a little more than three months of work we have found 1,655 factors, saving a total of 250,131 GHz days (685 GHz years) of LL, DC and P-1 work!!!
|
|
|
|
|
|
#506 | |
|
"Jerry"
Nov 2011
Vancouver, WA
21438 Posts |
Quote:
|
|
|
|
|
![]() |
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Status | Primeinator | Operation Billion Digits | 5 | 2011-12-06 02:35 |
| 62 bit status | 1997rj7 | Lone Mersenne Hunters | 27 | 2008-09-29 13:52 |
| OBD Status | Uncwilly | Operation Billion Digits | 22 | 2005-10-25 14:05 |
| 1-2M LLR status | paulunderwood | 3*2^n-1 Search | 2 | 2005-03-13 17:03 |
| Status of 26.0M - 26.5M | 1997rj7 | Lone Mersenne Hunters | 25 | 2004-06-18 16:46 |