I must appologise for my absence from the forum of late, i have been working on other things. Yes, for those that are wondering, there are other things than working on GIMPS... although not widely known about.

Status of p-1 using the 24th February status files

Code:
          M         NUMBER
          0-13         0
          13           0
          14           0
          15         167
          16           2
          17          84
          18         455
          19        1494
          20        1108
          21         525
          22         308
          23         290
          24         256
          25         141
          26          94
          27          27
          28           0
          29           3
          30           0
I have changed the format slightly. There haven't been any p-1s that needed to be done up to 13M for months now so I have made that one big range for easier reading (as if it got any bigger you would have to start using the scroll within the code - and that is just messy).

I have also included everything up to 30M now. Although we haven't got up to that range on primenet (with the exception of the +10mil digits) but it will be interesting to see how it grows. To see if how people actually do the the p-1 and how many skip it.

Code:
0.1MRANGE    NUMBER    CHANGE
   15.0       100         0
   15.1         0         0
   15.2         0         0
   15.3         0         0
   15.4         0         0
   15.5         0         0
   15.6         0         0
   15.7         0         0
   15.8         0         0
   15.9        67         0
   16.0         0         0
   16.1         0         0
   16.2         0         0
   16.3         0         0
   16.4         0         0
   16.5         0         0
   16.6         0         0
   16.7         0         0
   16.8         0         0
   16.9         2        +1
   17.0         0         0
   17.1         0         0
   17.2         0         0
   17.3         0         0
   17.4         0         0
   17.5         0         0
   17.6        83         0
   17.7         0         0
   17.8         0         0
   17.9         1         0
   18.0         0      -108
   18.1         0      -126
   18.2         0      -100
   18.3         0      -113
   18.4         0      -123
   18.5         0      -120
   18.6        54       -56
   18.7       102         0
   18.8       180         0
   18.9       119         0
   19.0       127         ?
   19.1       113         ?
   19.2       136         ?
   19.3       148         ?
   19.4       133         ?
   19.5       138         ?
   19.6       153         ?
   19.7       235         ?
   19.8       130         ?
   19.9       181         ?
I have now included a "breakdown" view up to 20million as I have now all work below 20million is now available for claiming in the forum. It is also good to see that we are developing quite a lead on the leading edge of double checking. Everything up to 15mil is now on primenet.

Those 167 exponents in the 15mil range are being worked on, just incase anyone was wondering what was happenning with them.

Also, just incase anyone was wondering, sometimes the numbers of exponents that need to be p-1ed in the list above might be greater than the number in the corresponding block that I have posted in the forums. This is because I don't assign any exponent that it currently being worked on that was assigned through primenet (ie is currently in status.txt).

Last fiddled with by dave_0273 on 2005-03-04 at 05:52