View Single Post
Old 2019-07-25, 06:57   #3
scan80269
 
"Sam"
Jun 2019
California, USA

2·17 Posts
Default

Many thanks for the pointer, petrw1!

The PauseWhileRunning parameter should fit my needs exactly.

For a lighter workload during weekends as opposed to completely pausing, I suppose I can use two worker threads per DC/LL/PRP and split the CPU cores between them, then pause one worker during the designated times.

I normally run just one worker with all the cores, as it results in highest overall throughput. Using two workers with half the cores per worker may result in slightly reduced total throughput, but it's still probably a good trade-off to gain the desired control over how much CPU Prime95 gets to use.

Cheers!
scan80269 is offline   Reply With Quote