![]() |
[Fri Dec 3 02:13:49 2004]
M1061 completed 200 ECM curves, B1=44000000, B2=4290000000 Thomas :coffee: |
[QUOTE=Mystwalker]Is the multiplier really 1? After all, these curves have been done with gmp-ecm and higher bounds than 100 * B1...[/QUOTE]
Hmm. I belive so : I based that on post #114 (and also the README of gmp-ecm) which has this table : [CODE] digits D optimal B1 B2 expected curves N(B1,B2,D) 15 2e3 1.2e5 30 20 11e3 1.4e6 90 25 5e4 1.2e7 240 30 25e4 1.1e8 500 35 1e6 8.4e8 1100 40 3e6 4.0e9 2900 45 11e6 2.6e10 5500 50 43e6 1.8e11 9000 55 11e7 6.8e11 22000 60 26e7 2.3e12 52000 65 85e7 1.3e13 83000 70 29e8 7.2e13 120000 Table 1: optimal B1 and expected number of curves to find a factor of D digits. [/CODE] So at the time I posted the summary we had done 179 of 22000 curves. *stops to think* I see that I did not specify the expected number of curves for that level. Sorry for that. :redface: I will do that in the future. Thomas :coffee: |
3 Attachment(s)
Just for fun, here are save files for 60, 65 and 70 digits...
|
[Sun Dec 5 18:15:32 2004]
M1061 completed 200 ECM curves, B1=44000000, B2=4290000000 edit : From George's page I see that only 2007 curves remain for B=44000000. I have done 800 curves and will mail George. Thomas :coffee: |
Completed 200 curves: B1=11e7, B2=52e9, Dickson(12) polynomial (multiplier 0.61)
According to rho.gp, with B1=11e7, B2=43e9 and k=5, increasing the polynomial from degree 12 to degree 30 increases the effectiveness of the curve for finding 55 digit factors by 4.6%, and on my P4 (if gmp-ecm is used for the whole curve) increases the time per curve by only 3.3%. But if mprime was used to do stage one of the curve, the time increase per curve is 7.9%. (because stage two then accounts for a larger proportion of the curve). By default gmp-ecm switches from using the degree 12 to using the degree 30 polynomial at about B2=31e9, so if using mprime to do stage one this should be advanced. I haven't worked out the ideal crossover point, but it is above 86e9 for M1061 curves, probably much higher. |
M1061 completed 100 ECM curves, B1=44000000, B2=4290000000
Also did these at the 55 digit level:- M1061 completed 5 ECM curves, B1=110000000, B2=4290000000 How many 'standard' GMP-ECM curves are these equivalent to? |
[QUOTE=Wolf]Also did these at the 55 digit level:-
M1061 completed 5 ECM curves, B1=110000000, B2=4290000000 How many 'standard' GMP-ECM curves are these equivalent to?[/QUOTE] Each is worth 0.35 gmp-ecm default curves, not bad for such a small stage two, but if you used gmp-ecm to do do the stage two step -- even if you only spent the same itime n stage two that Prime95 did -- you could increase that to 0.45 or more. |
[Wed Dec 8 06:35:47 2004]
M1061 completed 200 ECM curves, B1=44000000, B2=4290000000 Thomas :coffee: PS : I will be offline until monday. |
[QUOTE=geoff]Each is worth 0.35 gmp-ecm default curves, not bad for such a small stage two, but if you used gmp-ecm to do do the stage two step -- even if you only spent the same itime n stage two that Prime95 did -- you could increase that to 0.45 or more.[/QUOTE]
Thanks for the info, I was just curious. I don't think I'll be any more curves at that level. |
[Fri Dec 17 18:07:08 2004]
M1061 completed 200 ECM curves, B1=44000000, B2=4290000000 Thomas :coffee: |
Since so few curves remain for B1=44M I will try to mail George with curves as they are posted.
Summary: Wolf : 100 curves (8 dec). thomasn : 400 curves. I have emailed George the 500 curves done since last summary. Thomas :coffee: |
| All times are UTC. The time now is 07:36. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.