mersenneforum.org

mersenneforum.org (https://www.mersenneforum.org/index.php)
-   PrimeNet (https://www.mersenneforum.org/forumdisplay.php?f=11)
-   -   Assignment Problem? (https://www.mersenneforum.org/showthread.php?t=16506)

Dubslow 2012-02-27 22:27

As far as the useful-but-not-terribly-long thing goes, Double Check LLs are around 28M at the moment, which means that while a 48M expo is something like 90 GHzDays to test, the 28M double check would take ~25 GHzDays to do, which would only be around 2 months on the laptop (and we could always use more DC throughput). Just food for thought.

cheesehead 2012-02-27 23:14

scubabob,

None of your clocks are wasted, as long as you're cooperating with PrimeNet about assignments. Some folks confuse the worktype on which a particular CPU has maximum efficiency with the only worktype worth doing by that CPU. But like LaurV, I'd encourage you to continue doing what you like best.

P.S. I was an assembly programmer, too, for many years and also had a fondness for maximizing what those wonderful CPUs could did.


All times are UTC. The time now is 23:29.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.