mersenneforum.org

mersenneforum.org (https://www.mersenneforum.org/index.php)
-   Data (https://www.mersenneforum.org/forumdisplay.php?f=21)
-   -   Newer milestone thread (https://www.mersenneforum.org/showthread.php?t=13871)

S485122 2020-09-03 14:10

[QUOTE=Prime95;555802]...
I've been working on clearing out the 93M TF problem. I should have it all cleared by month's end.[/QUOTE]The same problem exists for double checking : 18 exponents that where in CAT 1 DC have been handed out for TF "Manual Testing" to relatively slow (judging by the rate at which they complete) workers. CAT 0 and CAT 1 assignments should not be available for manual testing whatever the work type requested, not only unavailable for manual PRP or LL testing but also unavailable for TF, P-1, ECM or whatever.

I am also not sure the recycling rules as stated on the PrimeNet site are enforced. For instance there are a bit less than 60 assignments in CAT 1 or O that have not been reported about for more than 30 days, the rules state that "Assignments are recycled if assignment ... does not report in for 30 days".

More than 400 assignments are older than 120 days while CAT 2 recycling rule states that "Assignments are recycled if ... or when the exponent moves midway into the first category and the assignment is more than 120 days old."

And so on.

Jacob

Uncwilly 2020-09-03 19:30

This list shows dozens in the DC Cat 1 range with no expiration dates and some with dates beyond the Cat 1 "Must be completed in 60 days" limit.
[URL="https://www.mersenne.org/assignments/?exp_lo=53837041&exp_hi=54000000&execm=1&exp1=1&extf=1&exfirst=1"]https://www.mersenne.org/assignments/?exp_lo=53837041&exp_hi=54000000&execm=1&exp1=1&extf=1&exfirst=1[/URL]

Uncwilly 2020-09-11 02:58

Based upon the numbers highlighted in red, it appears that we have had 10,000 exponents that have been PRP'ed and had their Certs run.:beer:

[CODE]----------=-----=-- | -----=-----=-----=-----=----- | -----=-----=-----=----- | -----=-----=-----=----- |
Exponent Range | Composite | Status Unproven | Assigned | Available |
Start Count P | F DC |LL/PRP ERR NO-LL | TF P-1 LL/PRP DC | TF P-1 LL/PRP DC |
----------=-----=-- | -----=-----=-----=-----=----- | -----=-----=-----=----- | -----=-----=-----=----- |

90000000 54705 | 35760 286 18659 | 3 34 | 18622 |
91000000 54578 | 35525 288 18741 1 23 | 24 40 | 18701 |
92000000 54444 | 35501 64 18831 48 | 29 19 | 19 18812 |
93000000 54423 | 35334 246 18599 244 | 244 6 | 18582 |
94000000 54645 | 35664 69 18768 2 142 | 143 2 | 1 18766 |
95000000 54452 | 35397 31 18826 4 194 | 1 176 6 | 21 18820 |
96000000 54364 | 35356 44 18930 34 | 7 2 | 27 18928 |
97000000 54431 | 35481 [COLOR="Red"]882[/COLOR] 17956 112 | 72 7 | 40 17949 |
98000000 54127 | 35443 [COLOR="red"]3343[/COLOR] 13847 4 1490 | 887 442 6 | 165 13837 |
99000000 54332 | 35257 [COLOR="Red"] 5093[/COLOR] 7529 1 6452 | 156 1107 38 | 5190 7457 |

100000000 54208 | 34581 21 1898 1 17707 | 714 459 19 21 | 12735 3781 1877 |
101000000 54316 | 34068 23 3158 5 17062 | 13963 108 3 | 2855 142 3154 |
102000000 54304 | 34206 43 3186 1 16868 | 15478 118 5 | 1065 209 3180 |
103000000 54206 | 34035 83 2721 1 17366 | 15712 268 11 | 1170 221 2706 |
104000000 54207 | 33880 [COLOR="red"] 197[/COLOR] 1828 2 18300 | 17593 690 4 | 18 3 1822 |
105000000 54071 | 33891 [COLOR="red"]171[/COLOR] 2031 7 17971 | 16423 632 7 | 926 2021 |
106000000 54061 | 33721 75 2712 10 17543 | 16482 655 9 | 420 2698 |
107000000 54135 | 34065 [COLOR="red"]739[/COLOR] 2438 13 16880 | 14925 1797 7 | 27 151 2423 |
108000000 54215 | 33554 44 531 2 20084 | 18794 462 475 1 | 239 117 529 |
109000000 54131 | 33760 4 656 3 19708 | 18233 703 2 | 613 165 651 |[/CODE]

Uncwilly 2020-09-13 23:43

A thread for Curtis Cooper exists: [url]https://www.mersenneforum.org/showthread.php?t=10870[/url]
If a user wants to start a Ben Delo thread...

Oops, just did it: [url]https://www.mersenneforum.org/showthread.php?t=25959[/url]

ATH 2020-09-15 19:21

Now there are TF assignments in the DC Cat 0 and Cat 1 again:

[url]https://www.mersenne.org/assignments/?exp_lo=53000000&exp_hi=54000000&execm=1&exdchk=1&exfirst=1&exp1=1[/url]

This should not happen, it only inspires / force us to poach these exponents.

Uncwilly 2020-09-15 19:31

[QUOTE=ATH;557077]Now there are TF assignments in the DC Cat 0 and Cat 1 again:

[url]https://www.mersenne.org/assignments/?exp_lo=53000000&exp_hi=54000000&execm=1&exdchk=1&exfirst=1&exp1=1[/url]

This should not happen, it only inspires / force us to poach these exponents.[/QUOTE]

The bounds on this page: [url]https://www.mersenne.org/manual_gpu_assignment/[/url]
need to be set to Cat4 to Cat4+10M

Uncwilly 2020-09-18 17:33

A nice little milestone happened yesterday. The DC vs LL/PRP ratio in the 99M range passed 1. That is more exponents have had the DC (Cert) done than only a FTC. 98M won't have this happen until the DC wave hits it. 100M and up can have this happen.

Also, early October we should clear the 92M milestone. And 93M looks like it will fall in October. 94M should be done by the end of November. And 95M by the end of the year looks like a strong likelihood.
:fusion: [FONT="Comic Sans MS"][B][SIZE="3"][COLOR="DarkOrchid"]Yeah, go team!! [/COLOR][/SIZE][/B][/FONT] :fusion:

[CODE]----------=-----=-- | -----=-----=-----=-----=----- | -----=-----=-----=----- | -----=-----=-----=----- |
Exponent Range | Composite | Status Unproven | Assigned | Available |
Start Count P | F DC |LL/PRP ERR NO-LL | TF P-1 LL/PRP DC | TF P-1 LL/PRP DC |
----------=-----=-- | -----=-----=-----=-----=----- | -----=-----=-----=----- | -----=-----=-----=----- |
90000000 54705 | 35760 287 18658 | 3 34 | 18621 |
91000000 54578 | 35525 300 18737 16 | 16 39 | 18698 |
92000000 54444 | 35501 69 18840 34 | 34 19 | 18821 |
93000000 54423 | 35334 348 18638 103 | 103 6 | 18613 |
94000000 54645 | 35664 72 18826 83 | 83 2 | 18824 |
95000000 54452 | 35397 40 18878 3 134 | 1 136 6 | 18872 |
96000000 54364 | 35356 49 18930 29 | 29 2 | 18928 |
97000000 54431 | 35481 891 17968 91 | 91 7 | 17961 |
98000000 54127 | 35449 4169 13930 4 575 | 78 393 2 | 108 13924 |
99000000 54332 | 35260 [B][COLOR="SeaGreen"]8051[/COLOR][/B] [B][COLOR="SandyBrown"]7660[/COLOR][/B] 1 3360 | 86 1295 56 | 1980 7561 |
100000000 54208 | 34651 21 1900 1 17635 | 100 1047 19 21 | 11318 5152 1879 |
101000000 54316 | 34082 23 3166 5 17040 | 13521 60 96 3 | 3223 146 3162 |
102000000 54304 | 34214 127 3193 1 16769 | 15387 40 107 5 | 1025 212 3187 |
103000000 54206 | 34036 92 2770 17308 | 15681 201 5 | 1201 227 2763 |
104000000 54207 | 33885 240 1918 2 18162 | 17507 615 2 | 40 4 1913 |
105000000 54071 | 33919 187 2133 7 17825 | 16128 711 5 | 996 2124 |
106000000 54061 | 33739 109 2749 10 17454 | 16306 570 9 | 591 2736 |
107000000 54135 | 34075 779 2544 11 16726 | 14880 1716 9 | 146 2524 |
108000000 54215 | 33567 53 555 3 20037 | 17910 433 792 1 | 897 10 552 |
109000000 54131 | 33791 4 712 3 19621 | 18186 617 2 | 647 179 705 |
[/CODE]

kriesel 2020-09-18 20:52

[QUOTE=Uncwilly;557301]A nice little milestone happened yesterday. The DC vs LL/PRP ratio in the 99M range passed 1. That is more exponents have had the DC (Cert) done than only a FTC. 98M won't have this happen until the DC wave hits it. 100M and up can have this happen.

Also, early October we should clear the 92M milestone. And 93M looks like it will fall in October. 94M should be done by the end of November. And 95M by the end of the year looks like a strong likelihood. [/QUOTE]98M LLDC was forecast for ~2033 back in late 2018, by interpolation of the simple extrapolation at [url]https://www.mersenneforum.org/showpost.php?p=502995&postcount=11[/url]
Also forecast 94M first test completion at end of 2020. If things go faster than the forecast, so much the better.

petrw1 2020-09-19 20:28

[QUOTE=kriesel;557314]98M LLDC was forecast for ~2033 back in late 2018, by interpolation of the simple extrapolation at [url]https://www.mersenneforum.org/showpost.php?p=502995&postcount=11[/url]
Also forecast 94M first test completion at end of 2020. If things go faster than the forecast, so much the better.[/QUOTE]

I can see us finishing all of 92-99 this year ... if those who grab the assignments behave.

kriesel 2020-09-28 14:30

5 left to 92M first test
 
[URL]https://www.mersenne.org/assignments/?exp_lo=91765997&exp_hi=92000000&execm=1&exp1=1&extf=1&exdchk=1[/URL] shows exponents by Friend and Zwen respectively, between 98 & 99% and stalled. An attempt to reach them by PM indicates no forum account for either. They don't appear in top 500 producers in the various categories, so no chance of picking up a usable email address or web link for them there, as has sometimes worked for reaching others in the past.
edit:
Expired LL FT attempts may be better followed up by PRP/GEC/proof.
If the expired first LL finally reports in, it would take another full LL (more in case of a mismatch, due to ~2% error rate per LL test; 1.04 more LL tests on average) to confirm.
If the expired first LL does not finally report in, it would take another 2 or more full LL runs to confirm; ~2.04 on average.
But in either case, a PRP/GEC/proof completed takes only a cert to conclude testing the exponent, ~1.01 tests total. And confirmation occurs in hours typically, not months or years. At high reliability.

Uncwilly 2020-09-28 14:45

And only 168 (this includes 4 errors that need to be rerun) will get us up to 98M. There are some that obviously won't finish before the expire. They might need a very early (even premature) doublecheck (since these are FT LL's an early LL DC won't waste cycles.).


On a different note: Over the weekend I noticed that Curtis Cooper is now running v30 on at least 1 machine. This bodes well. As does Ryan P hitting the 54M range hard with a bunch of DCs.


All times are UTC. The time now is 06:47.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.