![]() |
I think it is possible. maybe we have to do some seqs with pen and paper, but it is possible ;)
btw: 514050 jumped from C94 up to C174 at line 992/993 ;) a little bug in the DB reserving 515064 |
Done with 511902 and 511944.
I will take: 517050, 517056, 517104, 517140 |
[QUOTE=dekcarki;186504]I think it is possible. maybe we have to do some seqs with pen and paper, but it is possible ;)
btw: 514050 jumped from C94 up to C174 at line 992/993 ;) a little bug in the DB reserving 515064[/QUOTE] If the bug isn't fixed when it reaches 100, post the .elf here because 514050 is the last sequence below 515k and its reaching 100 will hopefully result in a much earlier ETA for the subproject. |
518628, 518568 done. Taking 515872, 515982.
518568 has a squared bug in DB at i=3253 and someone continues sequence for 70+ iters. Actually 518568 now C101 at i=3883 and I'm still working with it. |
514050 done :)
|
[QUOTE=dekcarki;186571]514050 done :)[/QUOTE]
[QUOTE=10metreh;182742]Estimated subproject completion date: 2 February 2010[/QUOTE] :smile: |
515028 Done
Reserving 515220 |
reserving 515250
|
518688 done
|
515040 Done but has an error at line 1318 in the DB
Reserving 515592 |
515064 done
reserving 515388 |
| All times are UTC. The time now is 22:13. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.