![]() |
Thanks for doing the tests, bsquared.
[quote]Anyone still have any poly selection going on?[/quote] I am going to run another overnight search. As long as we are using Jason's msieve-gpu branch, and there is not yet a gpu version of lasieve4, then I think it does not take away from optimality to do a bit more poly searching than usual. |
[QUOTE=jrk;192977]I am going to run another overnight search.[/QUOTE]
I have not found anything better, and I'm quitting the search. |
[quote=bsquared;192943]The clear winner is now this one from jrk:
[code] n: 1128681916333165583281832717120127496638972860118923964844791402387721331170448754199775637678274646951935918929237315749341487244542351920306209843985409563 # norm 2.797246e-15 alpha -7.634500 e 2.004e-12 skew: 7829822.03 c0: -392472115828519587544012662072667953792 c1: 1135538850431039541173288486836512 c2: 215718619935831247136208602 c3: -66702913924475596555 c4: 4019834079518 c5: 214800 Y0: -1393499379793961455729608702127 Y1: 581416348390623701 rlim: 45000000 alim: 45000000 lpbr: 29 lpba: 29 mfbr: 58 mfba: 58 rlambda: 2.6 alambda: 2.6 [/code] [/quote] I've started sieving using this poly, 14e siever. 5M-11M reserved. |
[QUOTE=bsquared;195494][CODE]
prp50 factor: 64585367109663600884438834766883466988940788491041 prp107 factor: 17475814829955286940449820582268098487907223506432350199456831446049454150141950051204743013474395998182843 [/CODE] Now on a C151.[/QUOTE] I've started a run of 1000 curves @ B1=43000000, B2=388112953420. ETA 15 hours. |
400 curves at B1=1M done.
Starting 2k curves at B1=3M (ETA 4hrs). How does one report work to the DB now? There used to be a 'report work' button that I can't find anymore. |
[B]How does one report work to the DB now? There used to be a 'report work' button that I can't find anymore.[/B]
go into the sequence,and beside the quick ecm button there is a >> button,click it,and at the bottom of the page you cant report the curves you've done. |
[quote=Dougal;195503]go into the sequence,and beside the quick ecm button there is a >> button,click it,and at the bottom of the page you cant report the curves you've done.[/quote]
Looks like you have to be logged in, as well. Thanks. |
After 2200 curves @ 11e6 I found a nice p47 :smile:
[QUOTE]Factor=12020207027570199228977626027667941677740462849 Method=ECM B1=11000000 Sigma=1642054642[/QUOTE] |
I am even luckier :smile:
[code]Input number is 685715905099648994219451416570299620797010724632513288765357600633214758490518989168523251153670344481394131623 (111 digits) Using B1=8000000, B2=23420528050, polynomial Dickson(12), sigma=4094310456 Step 1 took 23013ms Step 2 took 13485ms ********** Factor found in step 2: 4122529854091491338824929291779507173076398066909 Found probable prime factor of 49 digits: 4122529854091491338824929291779507173076398066909 Probable prime cofactor 166333763336873313888188992301635414394739143771207611922744147 has 63 digits [/code] Then, a few easy lines, and... |
[QUOTE=Batalov;195600]Then, a few easy lines, and...[/QUOTE]
A :censored: C161. :rant: |
Running 2000@1e8, should be able to say something on Monday
(other than 'at least gmp-ecm builds on OS X' and 'Mac Pro is fast') |
| All times are UTC. The time now is 23:02. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.