![]() |
curious timings running ECM curves
Hello,
atm my computer run ECM curves with B1=11e6 at M2539 and M2543. For M2539 prime95 uses FFT 112. One curve needs ~225 sec for stage 1 and ~76 sec for stage 2. For M2543 prime95 uses FFT 128. One curve needs ~183 sec for stage 1 and ~72 sec for stage 2. Is it possible to run prime95 with the larger FFT size at the smaller M2539, too? I could save ~40 sec per curve, and I want to run 2000 curves or so. Matthias |
You can force the larger FFT size. After the long assignment ID (or the string "N/A") in worktodo.txt insert the text ",FFT2=128" assuming this is an SSE2 machine. Use ",FFT=128" for non-SSE2 machines.
|
Thank you, this works fine. Indeed the curves about 40 sec faster now. :smile:
best regards, Matthias |
| All times are UTC. The time now is 15:39. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.